Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2022-07-28 19:14
408
Company Profile
Shanghai Ever International Corp., LtdBy certification [File Integrity]
Contact:everintl2(Mr.)
Email:
Telephone:
Phone:
Area:Beijing
Address:Beijing
Website:http://www.hydgetlighting.com/ http://everintl2.xinqili.net/
Product Introductions:
Model | LED Underground light |
Materials | 304 Stainless steel+aluminum |
Power | 3W |
LED Chip | CREE-XBD LED |
Lumens | 220LM(3W) |
CRI | >80Ra |
Beam angle | 45° |
Voltage | DC12-24V |
Color | 3000K, 4000K, 6000K |
Others | Red, Green, Blue, 2700K((customized)) |
Size | Ø45XH50mm, Opening:Ø40mm |
IP Rate | IP67 |
Warranty | 3 Years |
Applications | Plank road, terrace, steps, aisle, courtyard, hotel, KTV, etc |
304 stainless steel cover, structural waterproof IP67
Lighting effect:
Features:
1.CREE-XBD
2.45 degree lens
3.304 Stainless steel cover
4.Steel shrapnel
5.Waterproof nut
6.6063 aluminum lamp body
7.High temperature wire
8.Waterproof connector
INSTALLATION:
Wiring method 1
Pre-wire laying (low-voltage end divided into positive and negative wiring)
1.Cut off the waterproof terminal of the lamp
2.Connect the lights in parallel to the pre-arranged main wire
3.After the main wire is connected to the constant voltage power supply/transformer, then connected to 110V/220V
Wiring method 2
1. Pre-wire laying (low-voltage end divided into positive and negative wiring)
2. Cut off the waterproof terminal of the lamp(Male end)
3. The extension wire is connected in parallel to the pre laid main wire
4. The male end of the waterproof terminal of the lamp is connected with the female end of the extension wire
5. After the main wire is connected to the constant voltage power supply/transformer, then connected to 110V/220V
Wiring method 3
The diversion and extension wire is 0.3 square wire.
1W lamp, it is recommended to connect up to 20 lamps per group
3W lamp, each group is recommended to connect up to 8 lamps per group
Installation method 1: direct opening installation
Wooden board, gypsum board, marble or already done wall, etc., you can directly open the hole to install, as follows
Installation method 2: Installation with embedded parts
Installed with pre-buried parts, generally applied to concrete, lawn, etc. to facilitate fixed lights, as follows:
http://www.hydgetlighting.com/